The welding inspector certifies that the welds comply with contractual criteria, through high quality control procedures.

Inspeção de Terceira Parte

Third-Party Inspections

Third-Party Inspection is a type of welding inspection that ensures the productions procedures and quality control requirements, defined by the customer, are restrictly respected by the manufacturer.

BW Welding is a global quality assurance company,

that provides third-party weld inspection services worldwide, but more generally in Europe.

BW Welding inspectors, ensure that costumers procedures are applied to check the quality of welded products (before, during and after welding operations), through appropriate quality control methods, and ensures its compliance with industry standards and contractual requirements.

BW Welding’s technicians evaluate customers’ procedures and ensure the compliance of their equipment and documents before, during and after welding operations.

All our welding inspectors are qualified and oriented towards short or long-term projects, during maintenance and repair activities.

We provide solutions to overcome any challenge in the following inustries:

Civil construction

Civil construction

Automotive industry

Automotive industry

Oil&gas

Oil&gas

Petrochemical

Petrochemical

Shipbuilding and offshore

Shipbuilding and offshore

We have a consolidated know-how in the Welding structures, resulting from extensive experience in projects in the diferente inudstries, following all stages of construction.

To ensure compliance with the requirements at the various stages of construction, the client and the manufacturer must provide all necessary documentation, essential to stages of metal construction.

1
Check the conformity of raw materials
2
Ensure construction requirements are being respected
3
Visual inspection of products
4
Dimensional inspection of the product
5
Ensure compliance with surface treatment
6
Check all quality and structural tests have been carried out by qualified personnel and equipments
7
Ensure that Non-Conformities have been closed and corrective actions implemented
8
heck that loading was carried out correctly respecting the requirements.
9
Issue a detailed final report